Avalue has the expertise group and project management group for ODM projects, such as PSM team, PM team, and KAM team.
Customization Procedure
Stage 1: ODM Contract and Specification Avalue will present customer with the following upon customer’s Spec.
Stage 2: ID Design and Proof of Concept Customer owns Industrial Design, and 2 to 4 weeks lead-time
Stage 3: Circuit and Mechanical Design Mockup sample available to proof concept, and 10 to 12 weeks lead-time
Stage 4: Tooling and Tune Up Transparence tooling charge, and 6 to 8 weeks lead-time
Stage 5: Design Verification Test Avalue will perform following tests: CE/FCC, Avalue DVT test, Vibration/Drop test
Stage 6: Pilot Run A small scale pilot run (50~100 units), and 8 to 10 weeks lead-time
Stage 7: Mass Production Flexible production scale from as small as 200 units per lot up to 10,000 units per month, and ISO-9001 quality assurance.